Komatsu 930E-2 Dump Truck Service Repair Shop Manual - CEBM012200
Komatsu 930E-2 Dump Truck Service Repair Shop Manual - CEBM012200
This complete service repair workshop manual PDF download for the Komatsu Dump Truck 930E-2 (SN: A30296, A30297, A30300) has easy to read text sections with top quality diagrams, pictures and illustrations. The step by step instructions show you how to fault find or complete any repair or overhaul, correctly and efficiently, saving time and avoiding costly mistakes. All specifications and tolerances are listed. Functions of components and systems are also explained.
APPLICABLE MODELS :
Machine Model : Komatsu 930E-2
Serial Numbers : A30296, A30297, A30300
TABLE OF CONTENTS :
- GENERAL INFORMATION - STRUCTURES - ENGINE SYSTEMS - ELECTRIC SYSTEM (24 VDC. NON-PROPULSION) - ELECTRIC PROPULSION AND CONTROL - DRIVE AXLE, SPINDLES AND WHEELS - HYDRAIR® II SUSPENSIONS - BRAKE CIRCUIT - HYDRAULIC SYSTEM - OPTIONS AND SPECIAL TOOLS - OPERATOR'S CAB - LUBRICATION AND SERVICE - ALPHABETICAL INDEX - SYSTEM SCHEMATICS
MANUAL SPECIFICATION :
File Format : PDF Language : English Printable : Yes Searchable : Yes Bookmarked : Yes Product Code : CEBM012200 Total Pages : 924
This service repair workshop manual PDF download contains specs, diagrams, actual real photo illustrations, and schemes. In addition to space savings, nice thing about having completly searcheble PDF files instead of a hard-printed manual is that you can use the Search feature in your PDF reader software (Adobe Acrobat) to find just what your looking for and just print out the exact pages you need or all manual easily. This is the same Repair Service manual your local dealer will use when doing a repair.
Instant Download means there is NO shipping costs or waiting for a CD or paper manual to arrive in the mail! You will receive this manual TODAY via Instant Download on completion of payment via our secure payment processor. We accept ALL major credit/debit cards/paypal.
-
SECTION A - GENERAL INFORMATION - INDEX SECTION A2 - MAJOR COMPONENT DESCRIPTION SECTION A3 - GENERAL SAFETY AND OPERATING INSTRUCTIONS - INDEX GENERAL SAFETY Safety Rules Safety Features Clothing And Personal Items Unauthorized Modification Leaving The Operator’s Seat Mounting And Dismounting Fire Prevention For Fuel And Oil Precautions When Handling At High Temperatures Asbestos Dust Hazard Prevention Prevention Of Injury By Work Equipment Fire Extinguisher And First Aid Kit Precautions When Using ROPS Precautions For Attachments PRECAUTIONS DURING OPERATION Safety Is Thinking Ahead Safety At The Worksite Fire Prevention Preparing For Operation Ventilation For Enclosed Areas In Operator’s Cab - Before Starting The Engine Mirrors, Windows, And Lights OPERATING THE MACHINE When Starting The Engine Truck Operation - General Check When Traveling In Reverse Traveling Traveling On Slopes Ensure Good Visibility Operate Carefully On Snow Avoid Damage To Dump Body Driving Near High Voltage Cables When Dumping Working On Loose Ground When Loading Parking The Machine TOWING WORKING NEAR BATTERIES Starting With Booster Cables PRECAUTIONS FOR MAINTENANCE BEFORE PERFORMING MAINTENANCE Warning Tag Proper Tools Stopping The Engine Before Service Securing The Dump Body DURING MAINTENANCE Personnel Attachments Working Under The Machine Keep The Machine Clean Rules To Follow When Adding Fuel Or Oil Radiator Water Level Use Of Lighting Precautions With The Battery Handling High Pressure Hoses Precautions With High Pressure Oil Precautions When Performing Maintenance At High Temperature Or High Pressure Rotating Fan And Belts Waste Materials TIRES Handling Tires Storing Tires After Removal ADDITIONAL JOB SITE RULES WHEN REPAIRS ARE NECESSARY SPECIAL PRECAUTIONS FOR WORKING ON A 930E TRUCK Preliminary Procedures before Welding or Performing Maintenance Normal Engine Shutdown Procedure Engine Shutdown Procedure before Welding or Performing Maintenance TRUCK OPERATION PREPARING FOR OPERATION Safety Is Thinking Ahead At The Truck - Ground Level Walk Around Inspection ENGINE START-UP SAFETY PRACTICES Cold Weather Starting AFTER ENGINE HAS STARTED MACHINE OPERATION SAFETY PRECAUTIONS MACHINE OPERATION ON THE HAUL ROAD DYNAMIC RETARDING OPERATION Dynamic Retarder Control Lever Dynamic Retarder/Service Brake Pedal Starting On A Grade With A Loaded Truck PASSING LOADING DUMPING Raising The Dump Body Lowering The Dump Body TOWING SAFE PARKING PROCEDURES NORMAL ENGINE SHUTDOWN PROCEDURE DELAYED ENGINE SHUTDOWN PROCEDURE SUDDEN LOSS OF ENGINE POWER SECTION A4 - WARNINGS AND CAUTIONS SECTION A5 - STANDARD CHARTS AND TABLES SECTION A7 - STORAGE AND IDLE MACHINE PREPARATION - INDEX STORAGE AND IDLE MACHINE PREPARATION Short Term Idle Periods PREPARATION FOR STORAGE REMOVAL FROM STORAGE RECONDITIONING AN IDLE VEHICLE ENGINE OPERATION After The Engine Has Started ENGINE STORAGE Preparing Engine For Storage Temporary Storage (30 Days Or Less) Extended Storage (more Than 30 Days) RESTORING AN ENGINE AFTER EXTENDED STORAGE ELECTRIC DRIVE TRUCKS Storage Instructions and Procedures Placing Equipment Into Storage Storing A Truck That Is Operational Storing A Truck That Is Not Operational Storing A Major Component Periodic Inspections Placing Equipment Into Service After Storage When A Truck Is Operational When A Truck Is Not Operational For The First Hour
SECTION B - STRUCTURES - INDEX SECTION B2 - STRUCTURAL COMPONENTS - INDEX STRUCTURAL COMPONENTS Preparation GRILLE, HOOD AND LADDER Removal Installation DECKS RIGHT DECK AND COMPONENTS Removal Installation LEFT DECK Removal Installation CENTER DECK SECTION B3 - DUMP BODY - INDEX DUMP BODY Removal Installation BODY PADS Adjustment BODY GUIDE HOIST LIMIT SWITCH BODY UP SWITCH BODY-UP RETENTION CABLE ROCK EJECTORS Rock Ejectors (Type I) Inspection Rock Ejectors (Type II) Inspection SECTION B4 - FUEL TANK - INDEX FUEL TANK Removal Installation Repair Cleaning FUEL GAUGE SENDER Removal Installation LOW FUEL SWITCH WIGGINS QUICK FILL FUEL SYSTEM FUEL RECEIVER TANK BREATHER VALVE Removal Installation Disassembly Assembly LEFT SIDE FILL
SECTION C - ENGINE - INDEX SECTION C2 - POWER MODULE - INDEX POWER MODULE Preparation Preparation for Removal Removal - Power Module Installation - Power Module Hookup - Power Module SECTION C3 - COOLING SYSTEM - INDEX COOLING SYSTEM RADIATOR Removal - Radiator RADIATOR REPAIR Internal Inspection External Cleaning Disassembly Cleaning and Inspection Assembly Pressure Testing Additional Service Information Installation - Radiator RADIATOR FILLING PROCEDURE COOLANT SYSTEM TROUBLESHOOTING SECTION C4 - POWERTRAIN - INDEX POWER TRAIN ALTERNATOR Removal - Alternator ENGINE/ALTERNATOR MATING General Instructions Measuring Procedure Joining The Alternator and Engine ENGINE Removal Service Installation SECTION C5 - AIR CLEANERS - INDEX AIR CLEANERS AIR CLEANERS Operation General Service Information FILTER ELEMENT REPLACEMENT Main Filter Element Cleaning Precleaner Section Cleaning Precleaner Tubes AIR INTAKE TROUBLESHOOTING SECTION C7 - FAN CLUTCH - INDEX FAN CLUTCH REMOVAL & INSTALLATION TOOLING FAN CLUTCH - DISASSEMBLY CLEANING AND INSPECTION ASSEMBLY - FAN CLUTCH TEST PROCEDURE
SECTION D - ELECTRICAL SYSTEM (24VDC NON-PROPULSION) - INDEX SECTION D2 - 24VDC ELECTRIC SUPPLY SYSTEM - INDEX 24VDC ELECTRIC SUPPLY SYSTEM ELECTRICAL SYSTEM DESCRIPTION BATTERIES Maintenance and Service Troubleshooting BATTERY SUPPLY SYSTEM 24VDC Battery Charging Alternator Battery Box Battery Control Box Isolation Diodes Battery Disconnect Switches 24VDC Auxiliary Battery Connectors Battery Equalizer Troubleshooting SECTION D3 - 24VDC ELECTRICAL SYSTEM COMPONENTS - INDEX 24 VDC ELECTRICAL SYSTEM COMPONENTS PASSENGER SEAT BASE COMPARTMENT TRUCK SHUTDOWN PROCEDURE COMPONENTS Tail Light Resistor Diode Assemblies 5 Minute Idle Timer Components 5 Minute Idle Timer 5 Minute Idle Relay 5 Minute Idle Contactor 5 Minute Idle Circuit Test Inclinometer Brake Warning Buzzer (BWB) Alarm Indicating Device (AID) System Coolant Level/Flasher Temperature and Latch Card Hot Switch Inverter Card Hot Switch Inverter Card (Slot 4) (Not Used) Oil Level Card Temperature Card Diode Matrix (Without Sound) Card Diode Matrix (With Sound) Card Lamp Test Switch Electrical Interface Cabinet Lubrication System Timer Lincoln Lube Delay Timer Barometric Pressure Transducer Pulse Voltage Modulator Power Distribution Terminals Truck Control Interface Panel Kontrol Power Relay Circuit Breaker Panel Diode Board - DB1 Diode Testing Relay Boards Relay Boards: RB1, RB2, RB3, RB4, RB5 Service Relay Board Identification Relay Board Functions Installing Additional Circuits Body Up Switch Operation Adjustment Service Hoist Limit Switch Operation Adjustment Service CIRCUIT BREAKER CHART BATTERY CHARGING ALTERNATOR ELECTRICAL SYSTEM DESCRIPTION BATTERY Maintenance and Service Troubleshooting TROUBLESHOOTING Preliminary Checks Preliminary Troubleshooting Disassembly SECTION D10 - BATTERY CHARGING ALTERNATOR - INDEX BATTERY CHARGING ALTERNATOR ELECTRICAL SYSTEM DESCRIPTION BATTERY Maintenance and Service Troubleshooting BATTERY CHARGING SYSTEM (Niehoff) General Description TROUBLESHOOTING PROCEDURES (On-Truck) Equipment Required: Preliminary Checks Test Setup Test Procedure Regulator Bypass Test ON VEHICLE TROUBLESHOOTING GUIDE ALTERNATOR ELECTRICAL CONDITIONS - Low Voltage - High Voltage - No Voltage BATTERY CONDITIONS AND CHARGE VOLTAGE REACTIONS: CHARGE VOLT AND AMP VALUES DEFINITIONS ADVANCED SYSTEM TROUBLESHOOTING Static Test - Engine OFF, Key ON, Battery Switch ON. Go To Alternator Go To Regulator (If Required) Go To Regulator Connector On The Alternator ALTERNATOR OVERHAUL ALTERNATOR DIMENSIONS ALTERNATOR SPECIFICATIONS SERVICE PARTS ON-VEHICLE TEST Equipment: Preliminary Checks: Test Set-up Test Procedure ON-VEHICLE TEST Bypass Test: BENCH TEST STATIC TESTS Regulator Tests Control Box Tests ALTERNATOR DISASSEMBLY ASSEMBLY- ALTERNATOR BF4822 STATOR SERVICE TOOL INSTRUCTIONS Stator Removal And Replacement Stator Installation
SECTION E - ELECTRICAL PROPULSION SYSTEM - INDEX SECTION E2 - ELECTRICAL PROPULSION SYSTEM COMPONENTS - INDEX ELECTRICAL PROPULSION SYSTEM COMPONENTS GENERAL SYSTEM DESCRIPTION SYSTEM COMPONENTS Auxiliary Blower System Propulsion System Controller (PSC) TRUCK CONTROL INTERFACE PANEL (TCI) Diagnostic Information Display DID PANEL EVENT CODES PSC SOFTWARE FUNCTIONS Input Processing STATE MANAGEMENT State Machine Transitions Between States DC Link State Powering the Link De-Powering the Link Control Functions Engine Control ALTERNATOR FIELD CONTROL Desired Three-Phase Voltage Desired DC Link Voltage Self-load Propel Torque Control Retard Torque Control Wheel Slide Control Resistor Grid Control Chopper Voltage Control AUXILIARY BLOWER CONTROL EVENT PROCESSING Event Detection Power On Tests Initiated Tests Periodic Tests EVENT RESTRICTIONS EVENT LOGGING AND STORAGE Event History Buffer Data Packs To Record and Save a Data Pack to a Floppy Disk Event Reset SERIAL DATA COMMUNICATIONS PSC - TCI Communications processing PSC - PTU Communications Processing Inverter Communications Processing OUTPUT PROCESSING ABNORMAL CONDITIONS/OVERRIDING FUNCTIONS Fast Start Engine Shutdown/Engine Not Running Limp Home Mode Entering/Exiting Limp Home Mode PROPULSION SYSTEM COMPONENT ABBREVIATIONS ELECTRONIC ACCELERATOR AND RETARD PEDALS Removal Installation Disassembly Assembly SECTION E3 - AC DRIVE SYSTEM ELECTRICAL CHECKOUT PROCEDURE - INDEX AC DRIVE SYSTEM ELECTRICAL CHECKOUT PROCEDURE AC DRIVE SYSTEM MAINTENANCE TRUCK SHUTDOWN PROCEDURES NORMAL TRUCK SHUTDOWN PROCEDURE SHUTDOWN AFTER SYSTEM FAILURE SYSTEM CHECKOUT Battery and Control Checks of System WITH Battery Power OFF Battery and Control Circuit Checks of System With Battery Power ON Checks with Key Switch OFF CPU Battery Checks MEMORY BACKUP BATTERY REPLACEMENT TCI PROGRAMMING PSC PROGRAMMING INVERTER PROGRAMMING TCI CHECKOUT Modular Mining Communication Port TCI Input Checks TCI Digital Output Tests TCI Digital Input Tests PSC Checkout Procedure PSC Digital Input Checks Miscellaneous Checks A3PV Panel LINKV Panel Thermistor Checks 17FM384 Panel Check Pedal Percentages and Meter Calibration Meter Calibration Procedure Reprogram With Serial Numbers and Pedal Percentages LOAD TESTING Preload Checks ADDITIONAL TRUCK CHECKS On-Board Load Testing Preparation Initiate Loadbox Test Manual Offset HP Output Adjustment TROUBLESHOOTING PVM Optimum Load Curve Handshaking Troubleshooting MISCELLANEOUS COMPONENT REPAIR Troubleshooting Phase Modules and Chopper Modules Phase Module Removal and Snubber Resistor Replacement Snubber Resistor Installation Phase Module Installation AUXILLIARY BLOWER CONTROL SYSTEM TROUBLESHOOTING AUXILLIARY INVERTER (CONTROLLER) TROUBLESHOOTING AUXILLIARY SNUBBER PANEL TROUBLESHOOTING IGBT TROUBLESHOOTING
SECTION G - REAR AXLE, SPINDLES AND WHEELS - INDEX SECTION G2 - TIRES AND RIMS - INDEX TIRES AND RIMS FRONT TIRES AND RIMS Removal Installation REAR TIRES AND RIMS Removal Installation RIM Tire Removal Tire Installation SECTION G3 - FRONT WHEEL HUB AND SPINDLE - INDEX FRONT WHEEL HUB AND SPINDLE WHEEL HUB AND SPINDLE ASSEMBLY Preparation Removal Installation - Wheel Hub and Spindle Assembly Disassembly - Wheel Hub and Spindle Assembly Cleaning and Inspection - Wheel Hub and Spindle Assembly Assembly - Wheel Hub and Spindle Assembly Wheel Bearing Adjustment: Brake Installation Seal Assembly Gap Check STEERING CYLINDERS AND TIE ROD Spherical Bearing Wear Limits Removal - Steering Cylinder and Tie Rod Installation - Steering Cylinder and Tie Rod Bearing Replacement TOE-IN ADJUSTMENT SECTION G4 - REAR AXLE HOUSING ATTACHMENT - INDEX REAR AXLE HOUSING ATTACHMENT PIVOT PIN Removal Installation PIVOT EYE BEARING Disassembly Assembly PIVOT EYE REPAIR Removal Disassembly Assembly Installation ANTI-SWAY BAR Removal Installation Disassembly Cleaning and Inspection Assembly SECTION G5 - REAR AXLE HOUSING - INDEX REAR AXLE HOUSING REAR AXLE HOUSING Preparation Removal Cleaning and Inspection - Rear Axle Housing Installation - Rear Axle Housing WHEEL MOTOR Preparation Removal Cleaning and Inspection - Wheel Motor Installation - Wheel Motor WHEEL MOTOR GEAR OIL Filtering Requirements Particle Size Analysis Flushing Oil Sample Analysis ELEMENT SPECIFICATION CHARTS
SECTION H - HYDRAIR® II SUSPENSIONS - INDEX SECTION H2 - FRONT SUSPENSIONS - INDEX FRONT SUSPENSION Removal Installation - Front Suspension "Turn-Of-The-Nut" Tightening Procedure MINOR REPAIRS (LOWER BEARING & SEALS) Removal - Bearing Retainer Installation - Bearing Retainer MAJOR SUSPENSION REBUILD Disassembly Assembly SECTION H3 - REAR SUSPENSIONS - INDEX REAR SUSPENSIONS Removal Installation - Rear Suspension Disassembly - Rear Suspension Cleaning and Inspection - Rear Suspension Assembly - Rear Suspension SECTION H4 - SUSPENSION OILING AND CHARGING PROCEDURE - INDEX SUSPENSION OILING AND CHARGING PROCEDURE GENERAL EQUIPMENT LIST Hydrair® Charging Kit Installation of Charging Kit Removal of Charging Kit Support Blocks For Oiling And Charging Dimensions FRONT SUSPENSION Front Suspension Oiling Front Suspension Nitrogen Charging REAR SUSPENSION Rear Suspension Oiling Rear Suspension Nitrogen Charging OIL AND NITROGEN SPECIFICATIONS CHART
SECTION J - BRAKE CIRCUIT - INDEX SECTION J2 - BRAKE CIRCUIT - INDEX BRAKE CIRCUIT SERVICE BRAKE CIRCUIT SECONDARY BRAKING AND AUTOMATIC APPLY PARKING BRAKE CIRCUIT BRAKE LOCK CIRCUIT WARNING CIRCUIT Rear Axle Brake Lines SECTION J3 - BRAKE CIRCUIT COMPONENT SERVICE - INDEX BRAKE CIRCUIT COMPONENT SERVICE BRAKE VALVE Rebuild Criteria Removal Installation DISASSEMBLY Cleaning and Inspection ASSEMBLY Actuator Base Threaded Inserts Boot and Cap Valve Body Seal Installation Regulator Sleeve O-Ring Installation Actuator Plunger O-ring Installation Assembly of Valve DIFFERENTIAL PRESSURE SWITCH Disassembly Cleaning and Inspection Assembly VALVE BENCH TEST AND ADJUSTMENT Test Set Up Procedure Brake Valve Output Pressure Adjustment Differential Pressure Switch Adjustment Final Test and Adjustment Installation Of Brake Pedal Actuator Assembly to Brake Valve Installation of Retard Pedal To Brake Pedal DUAL RELAY VALVE Removal Installation Disassembly Cleaning and Inspection Assembly DIFFERENTIAL PRESSURE SWITCH Disassembly Cleaning and Inspection Assembly VALVE TEST AND ADJUSTMENT Test Set Up Procedure Brake Valve Output Pressure Adjustment Differential Pressure Switch Adjustment HYDRAULIC BRAKE ACCUMULATORS Brake Accumulator Bleed Down Procedure ACCUMULATORS - HYDRAULICS COMPONENTS CABINET Removal Installation Disassembly Cleaning and Inspection Assembly Charging Procedure ACCUMULATORS - FRAME MOUNTED Removal Installation Disassembly Cleaning and Inspection Assembly Testing ACCUMULATOR CHARGING PROCEDURE RETARDER CONTROL LEVER (STEERING COLUMN-MOUNTED) Removal Installation Disassembly and Adjustment Potentiometer Check Assembly SECTION J4 - BRAKE CIRCUIT CHECK-OUT PROCEDURE - INDEX BRAKE CIRCUIT CHECK-OUT PROCEDURE EQUIPMENT REQUIRED INITIAL SYSTEM SET-UP BRAKE SYSTEM CHECKOUT Failure Modes Check-Out BRAKE CIRCUIT AND BRAKE VALVE TROUBLESHOOTING CHECK-OUT PROCEDURE SECTION J5 - WET DISC BRAKE ASSEMBLY - INDEX WET DISC BRAKE ASSEMBLY OPERATION MAINTENANCE Brake Disc Wear Indicator Removal/Installation - Wet Disc Brake Assembly BRAKE REBUILD Disassembly Cleaning and Inspection Assembly Floating Ring Seal Assembly/Installation WET DISC BRAKE BLEEDING PROCEDURE SECTION J7 - PARKING BRAKE - INDEX PARKING BRAKE OPERATION MAINTENANCE Inspection - Parking Brake Removal - Parking Brake Installation - Parking Brake Disassembly - Parking Brake Cleaning and Inspection - Parking Brake Assembly - Parking Brake PARKING BRAKE BLEEDING PROCEDURE
SECTION L - HYDRAULIC SYSTEM - INDEX SECTION L2 - HYDRAULIC SYSTEM - INDEX HYDRAULIC SYSTEM HYDRAULIC PUMP MODULE HOIST CIRCUIT OPERATION STEERING CIRCUIT OPERATION DISC BRAKE COOLING SYSTEM SECTION L3 - HYDRAULIC SYSTEM COMPONENT REPAIR - INDEX HYDRAULIC SYSTEM COMPONENT REPAIR HOIST PUMP Removal Installation INSPECTION OF PARTS Assembly HYDRAULIC TANK Filling Instructions Removal Installation HYDRAULIC TANK STRAINERS Removal Inspect and Clean Installation HYDRAULIC TANK BREATHERS SECTION L4 - STEERING CIRCUIT - INDEX STEERING CIRCUIT COMPONENT DESCRIPTION Steering Control Unit Bleeddown Manifold Valve Bleeddown Solenoid Relief Valves Hoist Limit Solenoid Accumulators Low Precharge Warning Switch High Pressure Filter Quick Disconnect Ports Flow Amplifier FLOW AMPLIFIER SYSTEM OPERATION No Steer Steering Left Steering Right No Steer, External Shock Load STEERING PUMP Operation PRINCIPLE OF OPERATION Full Pump Volume: Half Pump Volume: Neutral Position: Steering Pump SECTION L5 - STEERING CONTROL UNIT - INDEX STEERING CONTROL UNIT Removal Installation STEERING CONTROL UNIT REBUILD Disassembly Cleaning and Inspection - Steering Control Unit Assembly - Steering Control Unit SECTION L6 - STEERING CIRCUIT COMPONENT REPAIR - INDEX STEERING CIRCUIT COMPONENT REPAIR BLEEDDOWN MANIFOLD VALVE Removal Installation FLOW AMPLIFIER Removal Installation FLOW AMPLIFIER REBUILD Disassembly Assembly STEERING CYLINDERS Disassembly Piston Seal & Bearing Installation Cylinder Assembly Test STEERING AND BRAKE PUMP Removal Installation Disassembly Control Piston Group Valve Plate Group Rotating Group Swashblock Group Driveshaft Group Inspection Control Piston Group Valve Plate Group Rotating Group Swashblock Group Driveshaft Group Compensator Block and Unloader Module Stroke Adjuster Assembly Assembly Swashblock Group Driveshaft Group Rotating Group Valve Plate Group ACCUMULATORS Removal Installation Disassembly - Accumulators Cleaning and Inspection - Accumulators Assembly - Accumulators Testing - Accumulators Charging Procedure TROUBLESHOOTING CHART SECTION L7 - HOIST CIRCUIT - INDEX HOIST CIRCUIT HOIST CIRCUIT OPERATION COMPONENT DESCRIPTION Hydraulic Tank Hydraulic Pump High Pressure Filters Hoist Valve Inlet Sections - Hoist Valve Spool Sections - Hoist Valve Hoist Pilot Valve Bleeddown Manifold Hoist-up Limit Solenoid Pilot Operated Check Valve Overcenter Manifold HOIST CIRCUIT OPERATION Float Position Of Pilot Valve With Truck Body On Frame Power Up Operation Hold Operation Power Down Operation Float Operation SECTION L8 - HOIST CIRCUIT COMPONENT REPAIR - INDEX HOIST CIRCUIT COMPONENT REPAIR HOIST VALVE Removal Installation O-Ring Replacement INLET SECTION Disassembly Cleaning and Inspection Assembly REAR SPOOL SECTION (Work Ports) Disassembly Cleaning and Inspection Assembly FRONT SPOOL SECTION (Tank Ports) Disassembly Cleaning and Inspection Assembly HOIST PILOT VALVE Removal Installation Disassembly Cleaning and Inspection Assembly HOIST CYLINDERS Removal Installation Disassembly Cleaning and Inspection Assembly - Quill and Cylinder Quill Installation Installation Of Check Balls And Plugs In Quill Assembly of Cylinder OVERCENTER VALVE MANIFOLD DISABLED TRUCK DUMPING PROCEDURE Hookup DUMPING PROCEDURE Raising the Body Lowering the Body SECTION L9 - HYDRAULIC SYSTEM FILTERS - INDEX HYDRAULIC SYSTEM FILTERS HOIST CIRCUIT FILTER Filter Element Replacement Removal - Hoist Circuit Filter Installation - Hoist Circuit Filter Indicator Switch - Hoist Circuit Filter STEERING CIRCUIT FILTER Filter Element Replacement Removal - Steering Circuit Filter Installation - Steering Circuit Filter Indicator Switch - Steering Circuit Filter INDICATOR SWITCH Test Procedure SECTION L10 - HYDRAULIC CHECK-OUT PROCEDURE - INDEX HYDRAULIC CHECK-OUT PROCEDURE GENERAL INFORMATION STEERING CIRCUIT CHECK-OUT & ADJUSTMENT PROCEDURE Equipment Requirements Pump Pressure Control Adjustments Steering Control Unit and Flow Amplifier Leakage Test Bleeddown Manifold Leakage Test STEERING/BRAKE PUMP STROKE ADJUSTMENT SHOCK AND SUCTION VALVES Equipment Requirements HOIST SYSTEM RELIEF VALVE AND BRAKE COOLING CIRCUIT PRESSURES Equipment Requirements Pressure Gauge Locations Brake Cooling Circuit Test Power Up Relief Pressure Test Adjustment Power Down Relief Pressure Test Hoist Counterbalance Valve Adjustment Preparation: Counterbalance Valve Pressure Check Only: Counterbalance Valve Adjustment Preparation Flushing Procedure Filter Element Replacement 930E CHECK-OUT PROCEDURE - STEERING SYSTEM DATA SHEET 930E CHECK-OUT PROCEDURE - BRAKE COOLING & HOIST SYSTEM DATA SHEET
SECTION M - OPTIONS AND SPECIAL TOOLS - INDEX SECTION M2 - FIRE CONTROL SYSTEMS - INDEX FIRE CONTROL SYSTEM (MANUAL) Operation Inspection and Maintenance Recharging Procedures CHECKFIRE ELECTRIC DETECTION AND ACTUATION SYSTEM - SERIES 1 Control Module Actuator Linear Detection Wire Power Wire Test Kit Squib Securing the Detection Wire Preliminary Test Before Final Hook-Up Installation Procedure for Squib Placing the Electric Detection & Actuation System Into Service INSPECTION AND MAINTENANCE SCHEDULES Daily Normal Maintenance Based On Actual Operating Hours IN CASE OF FIRE TROUBLESHOOTING THE ELECTRIC DETECTION SYSTEM SECTION M8 - SPECIAL TOOLS SECTION M20 - PAYLOAD METER III - INDEX OPERATION SECTION Introduction Data Summary Data Gathering COMPONENT DESCRIPTION System Diagram Suspension Pressure Sensors Inclinometer Operator Display Operator Switch Speed Input Body-Up Switch Brake Lock Switch Payload Meter Communications Ports Keyswitch Input Payload Meter Power Load Lights Wiring and Termination TCI Outputs OPERATOR’S DISPLAY AND SWITCH Reading the Speedometer Reading the Load Display Using the Operator ID Using the Load and Ton Counter Total Ton Counter Total Load Counter Clearing the Counters Viewing Live Sensor Data Other Display Messages PAYLOAD OPERATION & CALCULATION Description of Haul Cycle States Haul Cycle Description Load Calculation Carry Back Measurement Accuracy SOURCES FOR PAYLOAD ERROR Payload Error Loading Conditions Pressure Sensors Swingloads Speed and Distance HAUL CYCLE DATA Haul Cycle Data Haul Cycle Warning Flags M: Haul Cycle Too Long N: Sensor Input Error Alarm Records Frame Torque Data Sprung Weight Data Maximum Speed Data PC SOFTWARE OVERVIEW PC Overview System Configuration Installing the PLMIII Software DOWNLOADING DATA PLM III SYSTEM CONFIGURATION Starting Communications Displayed Payload Units Time Units Connection Menu Connecting to the Payload Meter Configure the Payload Meter Setting the Date and Time Setting the Truck Type Setting the Gauge Display Units Setting the Frame Serial Number Setting the Truck Number Setting the Komatsu Distributor Setting the Komatsu Customer Clean Truck Tare Inclinometer Calibration DATA ANALYSIS Creating a Query Sorting on Truck Unit Number Sorting on Truck Type Sorting on Date Range Sorting on Time Range Payload Detail Screen Creating Reports Summary - one page report Detailed - multi-page report Creating Graphs Exporting Data CSV Export Compressed Importing Data Deleting Haul Cycle Records Viewing Alarms Deleting Alarm Records TROUBLESHOOTING SECTION TROUBLESHOOTING Viewing Active Alarms Real-Time Data Display Testing the Payload Lights Creating Log Files of Inputs Daily Inspections Periodic Maintenance Abnormal Displays at Power-Up No Payload Display When Keyswitch is Turned ON No Display on Speedometer No Display on Operator Display No Communications With PC Load Lights Don’t Light During Loading Load Lights Remain ON Load Lights Remain ON During Dumping Display Doesn't Clear When The Load Is Dumped Calibration Problems Alarm 1 - Left Front Pressure High Alarm 2 - Left Front Pressure Low Troubleshoot Wiring to Left Front Suspension Alarm 3 - Right Front Pressure High Alarm 4 - Right Front Pressure Low Troubleshoot Wiring to Right Front Suspension Alarm 5 -Left Rear Pressure High Alarm 6 - Left Rear Pressure Low Troubleshoot Wiring to Left Rear Suspension Alarm 7 - Right Rear Pressure High Alarm 8 - Right Rear Pressure Low Troubleshoot Wiring to Right Rear Suspension Alarm 9 - Inclinometer High Alarm 10 - Inclinometer Low Troubleshoot Inclinometer Wiring Alarm 13 - Body Up Input Failure Alarm 15 - Memory Write Failure Alarm 16 - Memory Read Failure Alarm 24 - System Key-On Status Operator Switch Doesn't Work Alarm 26 - User Switch Fault - SELECT Alarm 27 - User Switch Fault - SET Connector Map Connectors PLMIII CHECK OUT PROCEDURE General Description Tools Required Checkout Procedure PLMIII CHECKOUT PROCEDURE CONFIRMATION Flashburn Programming Confirmation Checklist PAYLOAD METER III COMPONENTS SECTION M31 - RESERVE ENGINE OIL SYSTEM - INDEX RESERVE ENGINE OIL SYSTEM Operation LED Monitor Light Tank Fill Control (Optional) Filling Procedure (Remote fill feature) SERVICE Every 10 Hours, or once each shift: Every 500 Hours: Changing Oil TROUBLESHOOTING Circuit Breaker or Fuse SYSTEM ELECTRICAL SCHEMATICS
SECTION N - CAB COMPONENTS - INDEX SECTION N2 - TRUCK CAB - INDEX TRUCK CAB Description Preparation Removal - Cab Installation - Cab CAB DOOR Removal Installation Door Adjustment Door Jamb Bolt Adjustment Door Handle Plunger Adjustment Door Glass Replacement Door Window Regulator Replacement Door Handle or Latch Assembly Replacement Door and Door Hinge Seal Replacement Door Opening Seal Removal Installation GLASS REPLACEMENT Adhesive Bonded Windows Replacement Procedure Windshield And Rear Glass Removal Installation SECTION N3 - CAB COMPONENTS - INDEX CAB COMPONENTS WINDSHIELD WIPERS Wiper Motor Replacement Removal Installation Wiper Arm Replacement Removal Installation Wiper Linkage Replacement Removal Installation WINDSHIELD WASHER Operation Service OPERATOR COMFORT OPERATOR SEAT Adjustment SECTION N4 - OPERTATOR COMFORT - INDEX OPERATOR COMFORT AIR CONDITIONING SYSTEM Environmental Impact OPERATOR CAB AIR CONDITIONING PRINCIPLES OF REFRIGERATION Air Conditioning Refrigeration - The Act Of Cooling The Refrigeration Cycle AIR CONDITIONER SYSTEM COMPONENTS Compressor (Refrigerant Pump) Service Valves Condenser Receiver-Drier Expansion Block Valve Evaporator ELECTRICAL CIRCUIT Thermostat Compressor Clutch Trinary™ Switch SYSTEM SERVICING SYSTEM OIL Handling and Reusing PAG Oil Oil Quantity Replacing Oil After Servicing the System Setting Up a New Compressor REFRIGERANT Recycled Refrigerant Reclaimed Refrigerant Refrigerant Quantity R-134a Refrigerant Containers SERVICE TOOLS AND EQUIPMENT Recovery/Recycle Station Leak Detector Service Valves Vacuum Pump Manifold Gauge Set Installing Manifold Gauge Set Purging Air From Service Hoses Stabilizing the AC System SYSTEM PERFORMANCE TEST SYSTEM LEAK TESTING Electronic Leak Detector Tracer Dyes Soap and Water SYSTEM REPAIR System Cleaning Hoses and Fittings Lines Expansion Valve Receiver-Drier Thermostat Compressor Clutch Servicing the Compressor Clutch Pulley Removal Clutch Coil Check Pulley Installation Clutch Assembly Installation RECOVERING AND RECYCLING THE REFRIGERANT Performing the Recovery Cycle Performing the Recycling Procedure Evacuating and Charging the AC System EVACUATING THE SYSTEM CHARGING THE AC SYSTEM HEATER / AIR CONDITIONER Operation Heater/Air Conditioner Vents COMPONENTS Circuit Breakers Relays Heater Core Fan Motor And Speed Control Actuators Filter Service TROUBLESHOOTING Pre-Diagnosis Checks Preparing For Diagnosis Preliminary Steps System Performance Test Diagnosis Of Gauge Readings And System Performance TROUBLESHOOTING BY MANIFOLD GAUGE SET READINGS PREVENTATIVE MAINTENANCE SCHEDULE FOR AC SYSTEM SECTION N5 - OPERATOR CAB CONTROLS - INDEX OPERATOR CAB CONTROLS STEERING COLUMN Removal Steering Column Inspection Installation STEERING WHEEL AND CONTROLS Horn Button Telescope Lock Ring Tilt Wheel Lever Turn Signal/Headlight Dimmer DYNAMIC RETARDING Retarder Control Lever Dynamic Retarder/Service Brake Pedal Accelerator (Throttle) Pedal Starting on a Grade With a Loaded Truck GRADE/SPEED RETARD CHART HEATER / AIR CONDITIONER COMPARTMENT AND CONTROLS Heater/Air Conditioner Vents INSTRUMENT PANEL OVERHEAD PANEL AND DISPLAYS CENTER CONSOLE F-N-R Selector Switch Hoist Control Lever Raising The Dump Body Lowering The Dump Body: Ash Tray Lighter L.H. Window Control Switch R.H. Window Control Switch Engine Shutdown Switch Override/Fault Reset Switch Retard Speed Control (RSC) Switch Retard Speed Control (RSC) Adjust Dial PSC Download Port Engine Diagnostics Download Port Engine Control System TCI Download Port Passenger Seat PAYLOAD METER Payload Meter Download Connector INSTRUMENT PANEL AND INDICATOR LIGHTS CONTROL SYMBOLS INSTRUMENT PANEL PANEL GAUGES, INDICATORS, AND CONTROLS Key Switch Starting Cold Weather Starting Normal Engine Shutdown Engine Shutdown Switch with 5 Minute Idle Timer Delay Fog Lights (Optional) Ladder Light Switch Manual Backup Switch Panel Illumination Lights Cab/Air Conditioner Vents Rotating Beacon Light Switch (Optional) Heated Mirror Switch (Optional) Wheel Brake Lock Control Parking Brake Control Tachometer Right Turn Signal Indicator High Beam Indicator Left Turn Signal Indicator Speedometer Voltmeter Engine Oil Pressure Gauge Water Temperature Gauge Fuel Gauge AC Drive System Temperature Gauge Hydraulic Oil Temperature Gauge Hourmeter Rest Switch Light Switch Windshield Wiper and Washer Panel Light Dimmer OVERHEAD STATUS / WARNING INDICATORS STATUS / WARNING INDICATOR LIGHT SYMBOLS Hazard Warning Lights Lamp Test Switch Link-On Warning Light
SECTION P - LUBRICATION AND SERVICE - INDEX SECTION P2 - LUBRICATION AND SERVICE - INDEX LUBRICATION AND SERVICE 930E SERVICE CAPACITIES HYDRAULIC TANK SERVICE Adding Oil WHEEL MOTOR SERVICE COOLANT LEVEL CHECK RADIATOR FILLING PROCEDURE RESERVE ENGINE OIL SYSTEM (Optional) Reserve Oil Tank Filling Procedure (Remote fill) LUBRICATION CHART 10 HOUR (DAILY) INSPECTION 50 HOUR LUBRICATION AND MAINTENANCE CHECKS 100 HOUR LUBRICATION AND MAINTENANCE CHECKS 250 HOUR LUBRICATION AND MAINTENANCE CHECKS 500 HOUR LUBRICATION AND MAINTENANCE CHECKS 1000 HOURS LUBRICATION AND MAINTENANCE CHECKS 2500 HOUR MAINTENANCE CHECKS 5000 HOUR MAINTENANCE CHECKS SECTION P3 - AUTOMATIC LUBRICATION SYSTEM - INDEX AUTOMATIC LUBRICATION SYSTEM GENERAL DESCRIPTION SYSTEM COMPONENTS SYSTEM OPERATION Normal Operation Pressure Failure Detection Circuits INJECTOR OPERATION GENERAL INSTRUCTIONS LUBRICANT REQUIREMENTS System Priming LUBRICANT PUMP Pump Housing Oil Level Pump Pressure Control Pressure Control Valve Adjustment INJECTORS (SL-1 Series “H”)) Injector Specifications Injector Adjustment SYSTEM CHECKOUT Lubrication Cycle Timer Check Lubrication Cycle Timer Adjustment FILTER ASSEMBLY PUMP REBUILD Disassembly Cleaning and Inspection Assembly SYSTEM TROUBLESHOOTING CHART PREVENTATIVE MAINTENANCE PROCEDURES Daily Lubrication System Inspection 250 Hour Inspection 1000 Hour Inspection
SECTION Q ALPHABETICAL INDEX
SECTION R SYSTEM SCHEMATICS HYDRAULIC SUPPLY AND BRAKE COOLING SCHEMATIC HYDRAULIC BRAKE SYSTEM SCHEMATIC PLM III ELECTRICAL SYSTEM SCHEMATIC PLM III HOOK-UP WIRING ELECTRICAL SCHEMATIC