This manual PDF download describes procedures for operation, handling, lubrication, maintenance, checking, and adjustment for the PC27MR-2, PC35MR-2 Galeo Komatsu Hydraulic Excavator. It will help the operator or anyone realize peak performance through effective, economical and safe machine operation and maintenance.
APPLICABLE MODELS :
Komatsu PC27MR - S/N: 15001 and up Komatsu PC35MR - S/N: 6736 and up
TABLE OF CONTENTS :
- SAFETY - OPERATION - MAINTENANCE - SPECIFICATIONS - OPTIONS AND ATTACHMENTS - HIGH-ALTITUDE SPECIFICATION MACHINE - INDEX
MANUAL SPECIFICATION :
File Format : PDF Language : English Printable : Yes Searchable : Yes Bookmarked : Yes Product Code : TEN00115-00 Total Pages : 261
Instant download means no shipping cost or waiting for a CD to arrive in the mail…you will receive this manual today via instant download on completion of payment via our secure payment processor. We accept all major credit/debit cards/paypal.
This page sometime can be found use following keyword : service manual, repair manual, workshop manual, technical manual, owner manual, operating manual, maintenance manual, parts manual. Please make sure you read and understand the title of this manual before decided to buy.
-
FOREWORD FOREWORD SAFETY INFORMATION INTRODUCTION DIRECTIONS OF MACHINE PRODUCT INFORMATION PRODUCT IDENTIFICATION NUMBER(PIN)/MACHINE SERIAL NO.PLATE ENGINE SERIAL NUMBER PLATE AND ITS LOCATION EMISSION CONTROL INFORMATION LABEL AND ITS LOCATION SERVICE METER LOCATION YOUR MACHINE SERIAL NUMBERS AND DISTRIBUTOR
CONTENTS
SAFETY SAFETY INFORMATION SAFETY LABELS LOCATION OF SAFETY LABELS SAFETY LABELS SAFETY INFORMATION SAFETY RULES IF PROBLEMS ARE FOUND WORKING WEAR AND PERSONAL PROTECTIVE ITEMS FIRE EXTINGUISHER AND FIRST AID KIT SAFETY EQUIPMENT KEEP MACHINE CLEAN KEEP OPERATOR'S COMPARTMENT CLEAN LEAVING OPERATOR'S SEAT WITH LOCK HANDRAILS AND STEPS MOUNTING AND DISMOUNTING NO PERSONS ON ATTACHMENTS BURN PREVENTION FIRE PREVENTION AND EXPLOSION PREVENTION ACTION IF FIRE OCCURS WINDSHIELD WASHER FLUID FALLING OBJECTS, FLYING OBJECTS AND INTRUDING OBJECTS PREVENTION CAUTIONS RELATED TO ROPS (ROLLOVER PROTECTION SYSTEM) ATTACHMENT INSTALLATION ATTACHMENT COMBINATIONS CAB WINDOW GLASSES UNAUTHORIZED MODIFICATIONS SAFETY AT JOBSITE WORKING ON LOOSE GROUND DISTANCE TO HIGH VOLTAGE CABLES ENSURE GOOD VISIBILITY VENTILATION FOR ENCLOSED AREA SIGNALMAN'S SIGNAL AND SIGNS EMERGENCY EXIT FROM OPERATOR'S CAB ASBESTOS DUST HAZARD PREVENTION SAFETY MACHINE OPERATION STARTING ENGINE CHECKS BEFORE STARTING ENGINE SAFETY RULES FOR STARTING ENGINE STARTING ENGINE IN COLD WEATHER OPERATION CHECKS BEFORE OPERATION SAFETY RULES FOR CHANGING MACHINE DIRECTIONS SAFETY RULES FOR TRAVELING TRAVELING ON SLOPES OPERATIONS ON SLOPES PROHIBITED OPERATIONS OPERATIONS ON SNOW PARKING MACHINE TRANSPORTATION LOADING AND UNLOADING SHIPPING THE MACHINE BATTERY BATTERY HAZARD PREVENTION STARTING ENGINE WITH BOOSTER CABLES TOWING SAFETY RULES FOR TOWING LIFTING OBJECTS WITH BUCKET SAFETY RULES FOR LIFTING OBJECTS SAFETY MAINTENANCE INFORMATION WARNING TAG KEEP WORK PLACE CLEAN AND TIDY APPOINT LEADER WHEN WORKING WITH OTHERS STOP ENGINE BEFORE CARRYING OUT MAINTENANCE CAUTIONS FOR OPENING (TILTING) FLOOR TWO WORKERS FOR MAINTENANCE WHEN ENGINE IS RUNNING PROPER TOOLS PERSONNEL ATTACHMENTS WORK UNDER THE MACHINE NOISE WHEN USING HAMMER WELDING WORKS REMOVING BATTERY TERMINALS SAFETY FIRST WHEN USING HIGH-PRESSURE GREASE TO ADJUST TRACK TENSION DO NOT DISASSEMBLE RECOIL SPRINGS SAFETY RULES FOR HIGH-PRESSURE OIL SAFETY HANDLING HIGH-PRESSURE HOSES WASTE MATERIALS AIR CONDITIONER MAINTENANCE COMPRESSED AIR PERIODIC REPLACEMENT OF SAFETY CRITICAL PARTS
OPERATION MACHINE VIEW ILLUSTRATIONS OVERALL MACHINE VIEW CONTROLS AND GAUGES DETAILED CONTROLS AND GAUGES MONITORING SYSTEM SWITCHES CONTROL LEVERS AND PEDALS WINDSHIELD SLIDING DOOR SLIDING WINDOW EMERGENCY ESCAPE HAMMER COVER WITH LOCK ENGINE REAR COVER COOLING COVER MUD COVER METHOD OF OPENING (TILTING) FLOOR FUSE BLOCK FUSE OPERATION MANUAL STORAGE TOOL BOX GREASE GUN HOLDER ASHTRAY MACHINE OPERATIONS AND CONTROLS BEFORE STARTING ENGINE STARTING ENGINE AFTER STARTING ENGINE STOPPING THE ENGINE MACHINE OPERATION STEERING THE MACHINE SWINGING WORK EQUIPMENT CONTROLS AND OPERATIONS PROHIBITED OPERATIONS GENERAL OPERATION INFORMATION TRAVELING ON SLOPES ESCAPE FROM MUD WORK POSSIBLE USING COMPACT HYDRAULIC EXCAVATOR BUCKET REPLACEMENT PARKING MACHINE MACHINE INSPECTION AFTER DAILY WORK LOCKING RUBBER SHOES AND ROAD LINERS TRANSPORTATION TRANSPORTATION PROCEDURE LOADING AND UNLOADING WITH TRAILER LIFTING MACHINE COLD WEATHER OPERATION COLD WEATHER OPERATION INFORMATION CAB HEATER IN COLD WEATHER AFTER DAILY WORK COMPLETION AFTER COLD WEATHER SEASON LONG TERM STORAGE BEFORE STORAGE DURING STORAGE AFTER STORAGE TROUBLES AND ACTIONS RUNNING OUT OF FUEL PHENOMENA THAT ARE NOT FAILURES TOWING THE MACHINE SEVERE JOB CONDITION DISCHARGED BATTERY OTHER TROUBLE
MAINTENANCE MAINTENANCE INFORMATION OUTLINE OF SERVICE HANDLING OIL, FUEL, COOLANT, AND PERFORMING OIL CLINIC ELECTRIC SYSTEM MAINTENANCE HANDLING HYDRAULIC SYSTEM WEAR PARTS WEAR PARTS LIST LUBRICANTS, FUEL AND COOLANT SPECIFICATIONS TIGHTENING TORQUE SPECIFICATIONS TIGHTENING TORQUE LIST SAFETY CRITICAL PARTS SAFETY CRITICAL PARTS LIST MAINTENANCE SCHEDULE MAINTENANCE SCHEDULE CHART MAINTENANCE INTERVAL FOR HYDRAULIC BREAKER MAINTENANCE PROCEDURE WHEN REQUIRED CHECK, CLEAN AND REPLACE AIR CLEANER ELEMENT CLEAN INSIDE OF COOLING SYSTEM CHECK LEVEL OF BATTERY ELECTROLYTE CLEAN WATER SEPARATOR ELEMENT DRAIN WATER AND SEDIMENT FROM FUEL TANK CHECK AND TIGHTEN TRACK SHOE BOLTS (MACHINE EQUIPPED WITH ROAD LINER) CHECK AND ADJUST TRACK TENSION (MACHINE EQUIPPED WITH ROAD LINER,STEEL SHOE) CHECK,RUBBER SHOES OR ROAD LINERS(MACHINE EQUIPPED WITH RUBBER SHOES,ROAD LINER) CHECK AND ADJUST RUBBER SHOE TENSION (MACHINE EQUIPPED WITH RUBBER SHOES) REPLACE RUBBER SHOES (MACHINE EQUIPPED WITH RUBBER SHOES) REPLACE ROAD LINERS(MACHINE EQUIPPED WITH ROAD LINER) REPLACE BUCKET TEETH CHECK WINDOW WASHER FLUID LEVEL,ADD FLUID CHECK,CLEAN AND LUBRICATE CAB SLIDE DOOR RAIL AND ROLLER LUBRICATING BLEEDING AIR FROM HYDRAULIC SYSTEM CHECK BEFORE STARTING EVERY 500 HOURS MAINTENANCE LUBRICATING CHANGE OIL IN ENGINE OIL PAN, REPLACE ENGINE OIL FILTER CARTRIDGE REPLACE FUEL FILTER CARTRIDGE CHECK OIL LEVEL IN FINAL DRIVE CASE, ADD OIL CLEAN AND INSPECT RADIATOR FINS AND OIL COOLER FINS CHECK AND ADJUST COOLING FAN BELT TENSION EVERY 1000 HOURS MAINTENANCE REPLACE HYDRAULIC OIL FILTER ELEMENT CHANGE OIL IN FINAL DRIVE CASE CHECK ENGINE VALVE CLEARANCE, ADJUST EVERY 2000 HOURS MAINTENANCE CHANGE OIL IN HYDRAULIC TANK, CLEAN STRAINER CHECK ALTERNATOR, STARTING MOTOR
SPECIFICATIONS SPECIFICATIONS
ATTACHMENTS, OPTIONS ATTACHMENTS AND OPTIONS-GENERAL INFORMATION SAFETY FIRST ATTACHMENT INSTALLATION BUCKET WITH HOOK PROHIBITED OPERATIONS AIR CONDITIONER CONTROL PANEL AND COMPONENTS AIR CONDITIONER CONTROLS AIR CONDITIONER MAINTENANCE WINDSHIELD WASHER WINDSHIELD WASHER OPERATION CHECK WINDOW WASHER FLUID LEVEL,ADD FLUID MACHINE READY FOR ATTACHMENT LOCATIONS HYDRAULIC CIRCUIT ATTACHMENT OPERATIONS LONG TERM STORAGE SPECIFICATIONS CHANGING MACHINE CONTROL PATTERN (IF PATTERN CHANGE VALVE EQUIPPED) CONTROL PATTERN CHANGE PROCEDURE MACHINE CONTROL PATTERNS POWER ANGLE BLADE BLADE CONTROL LEVER WHEN REQUIRED EVERY 500 HOURS SERVICE WEAR PARTS LIST SPECIFICATIONS ATTACHMENT GUIDE ATTACHMENT COMBINATIONS RECOMMENDED ATTACHMENT OPERATIONS HYDRAULIC BREAKER HIGH-ALTITUDE SPECIFICATION MACHINE LOCATIONS MAINTENANCE PROCEDURE EVERY 2000 HOURS MAINTENANCE SPECIFICATIONS